Project

Seaway Heavy Lifting – OLEG STRASHNOV – heavy lifting vessel DP 3

For this innovative high quality heavy lifting vessel of Seaway Heavy Lifting, we developed a diesel-electric propulsion concept, featuring a redundant energy generation and propulsion system. The thrusters are fed and controlled by direct water-cooled frequency converters in order to optimize the availability together with the Kongsberg ship management and DP system (DP3 notation).

Want to learn more about this project?
Please contact
foto John Hollemans
John Hollemans
Account manager
Send e-mail
1/1
Oleg Strashnov

Bakker Sliedrecht engineered and delivered the control system and automation for the powerful ballast water system. This project, executed by the Combination Croon Bakker, also includes switchboards, control desks, cabling and training.

Scope of the project:

  • Propulsion thrusters - 2 x 5,000 kW
    azimuth underwater (dis)mountable aft
  • DP thrusters - 2x 3,500 kW azimuth
    retractable at midship
  • Tunnel thrusters - 2 x 1,012 kW (DP)
    1,145 kW (auxiliary use) at bow
  • Main diesel generator sets
    6 x 5,400 kVA
  • Emergency diesel generator set
    1 x 1,000 kVA skid-mounted
  • Controldesks
  • Powerful ballast water system
  • Training