Projects we are proud of

Filter on:
Market
  • No filter
  • Dredging
  • Offshore
  • Maritime
  • Oil & Gas
  • Land-based
Product
  • No filter
  • Turnkey solutions
  •   System Integration
  •   Electrical Package
  •   Automation & Control
  •   Emergency Power Supply
  • Service & Maintenance
  •   Corrective Maintenance
  •   Preventive Maintenance
  •   Inspections
  •   Parts
  • Retrofit & Conversion
  •   Retrofit
  •   Conversion
  •   Low voltage switchgear
Year
  • No filter
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • 2010

DEME

Delivery of electrical power plant for world’s most powerful cutter suction dredger

Saint-Gobain Isover

With about 187.000 employees in 64 countries, Saint-Gobain is the largest producer of building materials in the world. Two deprived emergency power units had to be replaced at the production site of the Dutch subsidiary, Saint-Gobain Isover in Etten-Leur. The combination Bakker Sliedrecht/Pon Power won the public tender in competition and replaced the two generators by three Cat C15s.

Deme

Bakker Sliedrecht has been aawarded a contract for the engineering, delivery, and commissioning of the main electrical power package of the offshore installation vessel Orion. 

GIW Industries

GIW Industries, a manufacturer of heavy-duty dredge pumps has ordered two powerful submersible motors from Bakker Sliedrecht. The submersible motors are destined for a new hopper dredger that is being built at Wenchong Shipyard in China for the Chang Jiang Waterway Bureau (CWB). The large hopper dredger will work on dredging projects along the Yangtze River, the longest river in Asia.

Tata Steel

The Direct Sheet Plant (DSP) at Tata Steel produces high quality steel for a variety of industries. The equipment of the DSP that is required to process the steel is powered by 6,6 kV electrical drive systems of General Electric. Bakker Sliedrecht has been supporting the technical staff of the DSP with maintaining this critical equipment since 2015.

FNsteel

FNsteel is one of the European market leaders of high quality wire rod and wire rod products, especially for the automotive industry. The production location in Alblasserdam has different facilities for hot rolling and processing steel. In the Wire Processing Center, wire is processed in pickling, annealing and drawing facilities. Because of a new production line, FNsteel decided to expand the power supply of the wire drawing facility. Bakker Sliedrecht took care of the entire expansion project.

Jan de Nul Group

Bakker Sliedrecht has received the order from Jan de Nul Group to deliver ten IP 44 class Cummins generators. The generators will generate all electric power on board three new trailing suction hopper dredgers that are currently being built in China.

Huta

Huta, Saudi Arabia’s leading dredging operator, awarded Dutch system integrator Bakker Sliedrecht with a lifetime extension project for the electrical installation of the Huta 4. Aim of the project is to extend the lifetime of the 36-year-old cutter suction dredger with 15 years while increasing the efficiency of production.

Gearbox Services

Gearbox Services is a maintenance company that´s specialized in the overhaul of gearboxes. Before delivery, the refurbished gearboxes are subjected to a strict quality control. Bakker Sliedrecht came up with a sustainable and innovative solution to reduce energy consumption and costs of the testing process. The new configuration is part of a completely new production facility.

Van Oord

While working on a project in Indonesia, trailing suction hopper dredger Volvox Terranova was heavily damaged by an old sea mine. Van Oord decided to repair and modernize their vessel at the same time. Bakker Sliedrecht was part of this great project and got the assignment to modify the suction tube configuration and restore the electrical installations.

Shin-Etsu

Bakker Sliedrecht inspects and maintains low voltage switchgear of Shin-Etsu during a four-yearly planned maintenance for their plant in the Botlek business park. 

Damen Shipyards Group

Damen Schelde Naval Shipbuilding has delivered the first of two Perusak Kawal Rudal (PKR) guided missile frigates designated for the Indonesian Navy. Bakker Sliedrecht was responsible for the electrical auxiliary propulsion system. The frequency drives of this propulsion system are directly connected to the power grid while complying with the EMC regulations.

Rolldock

Bakker Sliedrecht has increased the reliability of the power management system of this multifunctional heavy lift, semi-submersible, roll-on/ roll-off vessel. In addition, the cool water pump was modified to realize fuel savings.

Subsea 7

For 8 Subsea 7 vessels, Bakker executed the engineering, manufacturing and mounting of the complete electrical installation and DP2/3 Kongsberg installation. 

BigRoll

Innovative propulsion configuration for safe, reliable and fast transits with focus on low fuel consumption.

Heerema Marine Contractors

Heerema Marine contractors launched a life time extension program for the Balder, one of their deepwater construction vessels. Bakker Sliedrecht played a vital role, working on three key projects of this life time extension program that took place in the Caland Canal in Holland.

Huisman

Bakker Sliedrecht took care of the design of the drive systems of the drilling equipment.

TESO

Bakker Sliedrecht is going to extend the lifetime of the ferry Dokter Wagemaker with 14 years by retrofitting the frequency drives. The Dokter Wagemaker has been transporting passengers safely between the Dutch mainland and the Isle of Texel since 2006.

 

 

 

Neptun Werft

New super 1A ice class 18000 m³ LNG tanker for Anthony Veder.

 

Sapura Kencana

Bakker Sliedrecht has engineered, delivered, installed, and commissioned the complete electrical installation of the Sapura Esmeralda. This 300-ton pipe laying support vessel has been developed for operations in the Brazilian offshore market.

Jan de Nul Group

Bakker Sliedrecht is working on the drive systems and auxiliary switchboards for one of the world’s largest cutter suction dredgers, JDN 8069, that is being built for Jan De Nul Group.

Damen Shipyards Group

Bakker Sliedrecht has delivered the main electrical installations of the Bibby WaveMaster 1 to Damen Shipyards Group. This Service Operations Vessel (SOV) is the first vessel purpose-built for the transfer and accommodation of offshore personnel and aims to maximize working time.

Seaway Heavy Lifting

For Seaway Heavy Lifting we developed a diesel-electric propulsion concept, featuring a redundant energy generation and propulsion system.

Inai Kiara

Bakker Sliedrecht engineered, delivered, and commissioned all main electrical installations of the Inai Kenanga. This 33.335 m2 trailing suction hopper dredger was built at the shipyard of Selat Melaka in Malaysia.

Damen

For Damen Shipyards Group, Bakker Sliedrecht is delivering a flexible electrical propulsion system for an Antarctic Supply Research Vessel (ASRV). The ASRV will be equipped with an electrical propulsion system that enables flexible use of the available power on board as multiple power configurations are supported. 

Van Oord

Bakker Sliedrecht took care of the electrical conversion of the fallpipe installation which enables accurate subsea rock installation at 1.300 meter below sea level, no matter the conditions. 

Seaway heavy lifting

Seaway Heavy Lifting relies on Bakker Sliedrecht for delivery of electrical spare parts for their heavy lifting vessels.

DEME

Challenging delivery of compatible electrical components and electrical design with floating boardnet frequency.

Seaway Heavy Lifting

In just 5 months the renovation of the STANISLAV YUDIN was carried out to ensure a lifetime extension of 10-15 years. 

Louis Dreyfus Armateurs Group

Bakker Sliedrecht has obtained two contracts from the Louis Dreyfus Armateurs Group: the main electrical systems of six new vessels, four self-propelled fazel barges and two floating crane transshipment units.

Damen Shipyards Group

For Damen Shipyards Group, Bakker Sliedrecht is delivering a silent electrical propulsion system for a state of the art fishery research vessel.

Deme

Bakker Sliedrecht assisted Deme with resolving power management issues on board the Flintstone, a fall pipe vessel.

Flemish government

Complete electrical system, vessel management system and installation for a low noise research vessel.

Coco Yachts

Boost of the transport capacity of Rio de Janeiro by 7 ferry catamarans.

Boskalis

Engineer, supervise installation works and commission all critical electrical installations. 

Stork Railway Services

For several services, Stork is relying on a train wheel press. In order to secure the maintainability of the control system of this critical equipment, Stork reached out to Bakker Sliedrecht.

TESO

Bakker Sliedrecht repaired switchboard on board of Texel ferry within two days.

Van Oord

One water-cooled frequency drive for both the pumps and the propellers instead of separate drives for these systems for these Van Oord heavy cutterdredgers.

Boskalis Dredging

Design and installation of electrical package for two Boskalis trailing suction hopper dredgers. 

High Wind NV

Bakker Sliedrecht contributes to higher safety and lower costs for the installation of wind turbines at sea.

Alstom

Bakker Sliedrecht delivered four mobile 72,5 kV GIS- station installations to Stedin and Alliander by order of Alstom.

Wagenborg Kazakhstan

Innovative icebreakers for Wagenborg provided with active front end frequency drives and propulsion motors.

Eneco

Bakker Sliedrecht has successfully replaced the 13 kV transformer of Windmill three of Windmill park II on the isle of Goeree-Overflakkee as additional work to our maintenance contract. 

A few customers we work for

work for logos