Alstom – Delivery of 72,5 kV mobile GIS- station installations

Bakker Sliedrecht delivered four mobile 72,5 kV GIS- station installations to Stedin and Alliander by order of Alstom. These installations can be mobilized during a calamity in order to safeguard the continuity of the power grid.

Stedin is responsible for safe and reliable transport of electricity and gas to 2 million customers in Holland. Alliander is responsible for maintaining and renewing the power grid that delivers electricity and gas to 3.3 million customers in the Netherlands.

1/2
mobile GIS- station installation
mobile GIS- station installation

Bakker Sliedrecht designed and delivered 4 mobile switchgear installations that fit in mobile containers. We incorporated the Gas Insulated Switchgear (GIS) from Alstom in this design. The containers are mounted on a steal frame in order to connect the high voltage cables properly.

 

All four mobile 72,5 kV GIS- station installations are delivered to Stedin and Alliander to satisfaction of Alstom.

 

Bakker Sliedrecht designed and delivered 4 mobile switchgear installations that fit in mobile containers. We incorporated the Gas Insulated Switchgear (GIS) from Alstom in this design. The containers are mounted on a steal frame in order to connect the high voltage cables properly.

Scope of the project:

  • 4 mobile 72,5 kV GIS-station installations
  • Station automation system
  • Rectifier system
  • Low voltage distributors
  • Airco / drying installation
  • Grounding
  • Lighting

Curious about our know-how?